October 2025 - Additional Information submitted for Bloch Wind Farm

RES has submitted Additional Information to the Scottish Ministers, which includes a reduction in the size of the proposal from 21 wind turbines to 18 wind turbines. Also included in the revised design is the reduction in tip height of three turbines from 230m to 180m and the removal of approximately 1,700m of access track.

For more information, please click here.